Design (DES)
A phase or type of work consisting of taking a recommended solution and scope of work defined in the preliminary design phase and developing a final design, including right-of-way and construction plans.
Design and Construction (EC)
Funding is provided for both design and construction costs.
Design and Right of Way (ER)
Funding is provided for both design and right of way costs.
Design, Right of Way and Construction (ERC)
Funding is provided for design, right of way, and/or construction costs.
Right of Way (ROW)
A phase or type of work in which the land needed to build a project is purchased.
Construction (CON)
A phase or type of work involving the actual building of a project.
Capital Acquisition (CAP)
Term used to denote the acquisition of rolling stock by NJ TRANSIT.
Statewide Investment (SWI)
NJ TRANSIT uses this designation to describe a series of coordinated smaller-scale projects in multiple locations, and in multiple phases of work, that address a specific mobility issue.
Utility (UTIL)
In some cases, the utility relocation work associated with a project must be programmed separately from the actual construction phase of work. These items are shown under the "Utility" category.